Monday, 2 April 2012
Reminder of A2 Closure Newington - 2nd of April
The closure of the A2 High Street , Newington is planned from Monday 2nd April 2012 for up to 3 weeks.
This for gas mains replacement works in the narrow section of the A2 at Newington .
It is anticipated that the road will be re-opened on, or hopefully before, Sunday 22nd April 2012.
Closure and alternative routes
The closure is between the junctions with Playstool Road and Bull Lane (with access as far as Wickham Close).
Other separate works will be done along sections of the A2 whilst it is closed to through traffic, and there are likely to be temporary traffic lights in certain places.
~ Delays are inevitable, so it is strongly recommended that drivers use the signposted alternative routes ~
The main alternative route is using the M2 motorway, via the A2, A249, M2 between junctions 5 and 4, A278 and A2.
Non-motorway traffic will be diverted via the A249 to Maidstone, then on the A229 and A230 to Chatham and back onto the A2.
The specific diversions are listed at the foot of this Bulletin.
Details of closure
This closure has been re-scheduled to be done during the Easter Holidays, and the timescale has been reduced from 6 weeks to 3 weeks, following extensive consultation.
Works will be carried out 6 days a week, working extended hours, to reduce the length of time that the road is closed.
The situation will be monitored daily to check the progress of the works and the impact they are having.
~ Whilst the road is closed, other highway works will be carried out to avoid the need for separate closures and minimise future disruption ~
Traffic issues
Signage will be in place on various roads leading from the A2 between Rainham and the A249 to indicate they are unsuitable for large vehicles.
Weight restrictions of 7.5 T (except for access) are likely on certain roads when signs are in place, and the roads involved are individually listed at the foot of this message.
Contacts
The works are being carried out by Morrison Utility Services on behalf of Southern Gas Networks.
The Southern Gas Networks 24-hour Customer Service Centre phone number is: 0845 070 1431
This bulletin contains public information and can be freely forwarded to any other road users who may be affected. Every care is taken to ensure the accuracy of the information, but no liability can be accepted for any changes or errors.
Road names are taken from the National Street Gazetteer on Elgin , with alternative names given where known.
For details of roadworks, please see: www.roadworks.org
Visit our website: www.kent.gov.uk/highways to find out how we look after the roads in Kent .
Alternative Routes
Motorway
A2 Keycol Hill, A249 Maidstone Road , M2 from Junction 5 to Junction 4, A278 Hoath Way , A2 London Road and A2 High Street.
Non-motorway
A2 Keycol Hill, A249 Maidstone Road, Detling Hill, Sittingbourne Road, Bearsted Road, Penenden Heath Road, Sandling Lane, A229 Running Horse Roundabout, Chatham Road, Maidstone Road, A230 Horsted Way, Maidstone Road, A2 Best Street, Brookside, Union Street, New Road, Chatham Hill, Rainham Road, Watling Street, Sovereign Boulevard, Watling Street, London Road and High Street.
Weight Restrictions
A 7.5 Tonne weight restriction (except for access) imposed on following roads, when the relevant signage is in place:
Oak Lane, Spade Lane, Mill Lane, Breach Lane, Lower Hartlip Hill, Playstool Road, Church Lane, Bull Lane, Callaways Lane and Rook Lane.
Customer Information Bulletin SW180G / 2
Regards
Phil Lightman
Road Closures Co-ordinator, East Kent Division
KCC Highways & Transportation
Javelin Way
Ashford
TN24 8AD
( 08458 247 800 (24-hour Contact Centre)
Fax : 01233 648318
E-mail: roadworkseast@kent.gov.uk